BURST PIPE AND RESULTANT DAMAGES CLAIM
ASSESSMENT
Black Bird Construction was contacted by the client’s insurance company to assess and conduct repair work. An assessment took place at the client’s property in Hout Bay, where various items were inspected and a quotation was then generated and accepted by the insurer and client. Below is a breakdown of what transpired during the claim and excerpts of the assessor’s findings have been included as a means to explain the various building work required to repair the damages. The scope of work has also been included along with photos of the damages before and after the repairs were completed. We hope you enjoy the post and if you would like to learn more about Black Bird Construction please feel free to contact us.
REPORT
Damage Report:
- Due to the nature of the situation, our leak detection and plumbing team were sent out immediately to assist the client with the burst pipe at the affected property. Our leak detection technician identified the burst pipe’s location under the driveway’s paving. The plumbing team then created an access point by excavating the area and immediately identified a section of cracked polycop pipe. They believe that the pipe cracked because of a few reasons such as expansion and contraction in the substrate, age, the fact that there have been municipal workers in the area switching the water-main supply on and off. The pipe however was found to have a massive crack running through it and had to replaced.
- As per the photos, new pex pipe was used to replace the section of polycop pipe as it is far more durable and long lasting. The burst was eliminated, and the new pipework is secure. Once the repairs were identified as successful, the building team then proceeded to repave the area as they could not leave the driveway as it was.
Resultant Damages:
- Due to the plumbing team having to access the burst pipe, the paving in the area was lifted and affected.
- Our building team then took over and re-paved the affected section of paving.
- The paving has been re-laid as it previously was and the repair work completed.
SCOPE OF WORKS
BELOW IS A BREAKDOWN OF THE REPAIR WORK CONDUCTED TO THE RESULTANT DAMAGES AT THE AFFECTED PROPERTY:
Demolishing work:
|
Rubble removal | Site clearance:
|
PHOTOS