ALARM SYSTEM | ELECTRICAL SURGE DAMAGE CLAIM
DAMAGE REPORT:
- Black Bird Construction was appointed to assess a damaged alarm system.
- After a thorough assessment of the alarm system, we found that transformer and PC board of the control panel have blown.
- After opening the transformer and doing a thorough inspection we found that the transformer had blown due to an electrical surge.
- Due to the transformer blowing it allowed AC voltage through to the PC board of the control panel which led to that component blowing as well.
- Our recommendation is that the transformer be replaced, as well as the control panel. It is not possible to conduct a repair to the existing components due to the PC being completely damaged.
NOTE: A request for a quote of a completely new alarm system was sent. The below SOW is for a new system and not to simply replace the damaged components.