GEYSER REPLACEMENT CLAIM
Black Bird Construction was appointed to assess and carry out the necessary repairs following the reported burst geyser incident. Upon inspection of the affected geyser cylinder, we confirmed that the unit had failed, resulting in water-related damage to the surrounding areas within the apartment. A detailed breakdown of the required remedial works has been prepared and submitted to the insurer for review and assessment.
| SCOPE OF WORK |
Geyser replacement:
- Drain existing geyser.
- Create larger opening via the trapdoor to remove the existing geyser.
- Remove existing geyser from site.
- Supply and replace the existing geyser with a new 150L Kwikot High Pressure geyser and trip-tray.
- The geyser includes with a 5-year warranty.
- All required materials and labour included in price.
- New geyser installation works to be SANS10254 compliant, as well as PIRB compliant.
- Burst Geyser: 150L Kwikot Code: 01-R-5 Serial: 131814
Compliancy work | PIRB certificate submission:
- Additional works needed to ensure that the geyser installation is compliant.
- PIRB compliancy certificate to be submitted once the geyser has been fully installed.
|
Rubble removal | Site clearance:
- Clean and clear all rubble from site.
- Ensure that the client’s property is left in a clean and orderly manner before vacating entirely from the site.
- Dispose of faulty geyser.
|