BURST PIPE CLAIM

ASSESSMENT

Black Bird Construction was contacted by the client’s insurance company to assess and conduct repair work. An assessment took place at the client’s property in Royal Ascot, where various items were inspected and a quotation was then generated and accepted by the insurer and client. Below is a breakdown of what transpired during the claim and excerpts of the assessor’s findings have been included as a means to explain the various building work required to repair the damages. The scope of work has also been included along with photos of the damages before and after the repairs were completed. We hope you enjoy the post and if you would like to learn more about Black Bird Construction please feel free to contact us.

 


 

DAMAGE REPORT

A burst pipe was identified at the property and our plumbing team was sent out immediately to conduct repairs to the pipework. A breakdown of the repairs has been detailed below:
 
Plumbing works | Emergency repairs:
  • Our plumbing team was sent out to conduct emergency repairs to a burst pipe in the client’s garden.
  • The burst pipe was exposed in the garden near the washing line.
  • Our plumbing team conducted a sectional repair on the burst 22mm polycop main supply.
  • Second burst/leak – Our plumbing team reported the secondary leak to the managing agents, the leak is outside Unit 35 in the driveway on common property. An updated report will be provided if neccessary.
 

 

SCOPE OF WORKS

BELOW IS A BREAKDOWN OF THE REPAIR WORK CONDUCTED TO THE RESULTANT DAMAGES AT THE AFFECTED PROPERTY:

Plumbing works | Emergency repairs:
  • Note: After hour rates applied.
  • Our plumbing team was sent out to conduct emergency repairs to a burst pipe in the client’s garden.
  • The burst pipe was exposed in the garden near the washing line.
  • Our plumbing team conducted a sectional repair on the burst 22mm polycop main supply.
  • Once the repairs were completed the affected area was covered with soil as previously found.
  • NOTE (Second burst/leak): Our plumbing team reported the secondary leak to the managing agents, the leak is outside Unit 35 in the driveway on common property.
  • All labour and materials are included in the pricing.
Rubble removal | Site clearance:
  • Remove all rubble from site and ensure that the client’s property is left in a clean and orderly manner before departing from site indefinitely.

 

 

 

 